Here is the Part 2 of the mapping report. It covers almost all December activities.
1. December 6
It was the only time Tanya went with me. The weather was great and we had a nice few hours in the park. Along the way I fixed elevation lines around the Community Center a bit, put a flat re-entrant on the very north of that segment and then made the first pass on new elevation around the Seniors Center.
2. December 14
Big step forward. Finalized elevation lines in the Seniors Center segment and did full field check for the north part of this segment. It was the first 100% done part of the new map!
3. December 15
Completed field check for the south part of the Seniors Center segment as well as south west from the Community center. As soon as "elevation" problem was out of the way, the whole process sped up significantly.
Also decided to avoid using "undergrowth" lines (whenever I can) and use different shade of green instead. So far I used 4 different shades: 20% (which is quite runnable), 35% (nasty), 50% (hard to walk) and "poisonous" green (impassable). Yes, there are a few physically impassable areas in this park - beware!
4. December 16
Field check and minor elevation fixes north of the Community Center. Note the "impassable" green there. The whole area is very hard to go through, though small.
5. December 20
Completed field check of the Community Center segment. White area was quick and easy. And as a result the whole north part of the park was done. Compare it with the original map!
The only remaining challenging piece was Boat House area (with new buildings), but more about it later.
Showing posts with label map of bond park. Show all posts
Showing posts with label map of bond park. Show all posts
Friday, January 2, 2009
Mapping in Fred G Bond Metro Park. Part 2
Monday, December 29, 2008
Mapping in Fred G Bond Metro Park. Part 1
As I promised before, here is the first part of my "mapping in the Bond park" saga. Comparing with the map refresh I did in Schenck forest a year ago, this one (though a refresh too) proved to be much more difficult. I think I already spent as much time in the Bond park as I did in Schenck forest and I am only about 50% done. There were several things that complicated this map refresh work for me:
- The base map was indeed very old and outdated. Not only the trails has changed, but also vegetation and terrain.
- There were several big construction projects completed after the base map was created. Community Center, Seniors Center, new boat house, new parking lots had to be added to the map along with appropriate changes in elevation lines.
- This time I decided to map vegetation (white/green/dark green areas as well as fallen trees), which I didn't do in Schenck forest.
Anyway, here is what I did (step by step):
1. November 5
Went to the park and talked to Tracy (park's manager?). She gave me permission to map the park and in general was very supportive. She would love to have a new map with a set of their fixed controls plotted on it. She also gave preliminary OK for our sprint event next year.
Then walked around the park and compared it to the base map. Oh, boy. So many new constructions! Also noticed that the dam at the lake was plotted on the base map 5-7 degrees off! Here is a portion of the base map which was updated the most.
2. November 6 - 13
Spent the next week by working with the aerial image of the area and moving new features to the base map. 5 most affected areas were:
- Community Center
- Seniors Center
- Fenced area with tool shacks and equipment
- Additional parking lot
- Restrooms by the parking low
Here is an aerial image I used (it is a few years old). I took it from Cary Parks web site (I checked Google maps too, but it had "summer" picture, which is hard to use because of tree shadows).
3. November 17
I went to the park and compared my "aerial like" map of the Community Center with the real Community Center. It was clear that the whole block with the Community Center and parking lot was somewhat misplaced:
- It was too close to the road on the left
- The building was too big
- The building wasn't aligned with the trails intersection (see arrows on the map)
4. November 23
I finally was able to place the Community Center "block" correctly, so it would correspond to the western road and eastern trails.
Also fixed the outlines of the fenced area and reduced the "garden" south from the fence. The "garden" was actually plotted on the base map with a "25 yards" mistake. After that my trust for the base map accuracy completely evaporated and I started to double check every feature on the map. (Jumping ahead, I indeed had to fix several similar errors in other areas of the park later on)
5. November 24
With Community Center properly is place, I was able to do more refined work in that area. Put new trails and open areas on the map. Note though that the elevation is not fixed there. I haven't done it before and didn't even know where to start, so I was putting it off.
6. November 25
More refining work (still afraid to touch elevation lines):
- Mapped intricate details inside the Seniors Center (I wonder why, we shouldn't be running there anyway)
- Added the "greenhouse" area
- Made the first pass on vegetation south west from the Community Center (as you will see, I re-did this part a few weeks later)
- Mapped the scary "impassable" area (again re-did it later)
7. November 30
My first attempt to put correct elevation lines in place!
Not the final one, but it was a big step for me. From that point on, I at least wasn't afraid of doing it. And practice makes perfect, right?
I guess it is enough for the first part :-) More to come...